Was the picture (paints, painted, painting)?
Answers
the answer is PAINTED
hope i helped :)
Explanation:
The picture was painted
(1) 330
(2) 692
(3) 110
(4) 43.25
Step-by-step explanation:
The data provided is for the dying time of four different types of paint.
One-way ANOVA can be used to determine whether all the four paints have the same drying time.
Use Excel to perform the one-way ANOVA.
Go to Data → Data Analysis → Anova: Single Factor
A dialog box will open.
Select the data.
Select "Grouping" as Columns.
Press OK.
The output is attached below.
The required values are as follows:
(1)
Sum of Squares of Treatment (Between Subjects):
SST = 330
(2)
Sum of Squares of Error (Within Subjects):
SSE = 692
(3)
Mean Squares Treatment (Between Subjects):
MST = 110
(4)
Mean Squares Error (Within Subjects):
MSE = 43.25
[tex]Four different paints are advertised as having the same drying time. To check the manufacturer's cla[/tex]
60 minutes
Step-by-step explanation:
How fast can one team member paint?
20 * 36 = 720 minutes
One team member can paint a 4800 square wall in 720 minutes.
How fast can one team member paint a square wall of 3600 square feet?
720 * (3600/4800) = 540 minutes
Now how fast would it take 9 team members?
540 / 9 = 60 minutes.
answer:
Top dollar bro top dollar, do you have a girl yet
Explanation:
can i get brain crown th
Explanation:
Explained below.
Step-by-step explanation:
The data provided is for the dying time of four different types of paint.
One-way ANOVA can be used to determine whether all the four paints have the same drying time.
Use Excel to perform the one-way ANOVA.
Go to Data → Data Analysis → Anova: Single Factor
A dialog box will open.
Select the data.
Select "Grouping" as Columns.
Press OK.
The output is attached below.
The required values are as follows:
(1)
Sum of Squares of Treatment (Between Subjects):
SST = 330
(2)
Sum of Squares of Error (Within Subjects):
SSE = 692
(3)
Mean Squares Treatment (Between Subjects):
MST = 110
(4)
Mean Squares Error (Within Subjects):
MSE = 43.25
[tex]Four different paints are advertised as having the same drying time. To check the manufacturer's cla[/tex]
i love them...great job
Explanation:
It takes 70 minutes for 9 team members (painting 60 sq ft per minute) to paint a 4200 sq ft wall.
Step-by-step explanation:
4800 ÷ 20 = 240 sq ft per team member in 36 minutes
240 ÷ 36 = 6.67 sq ft per team member in 1 minute
6.67 × 9 = 60 sq ft per 9 team members in 1 minute
4200 ÷ 60 = 70 minutes (or 1 hour and 10 minutes)
Step-by-step explanation:
Your like helping someone